1. The Federal Democratic Republic of Ethiopia (FDRE) has allocated budget towards the cost of the following Road Construction Projects and intends to apply part of this budget to payments under these projects.

 

Package XXIV (24)

Item

No.

Project Name

Estimated Length (Km)

Pavement

Type

Project

Duration

Contract

Delivery

Procurement Type

1

Construction Works of Cheriti-Goro Beska – Gordamole, Lot III: Kundi – Gordamole

Road Project (Re-Tender)

83

 

DBST

 

3.0 Years

 

DBB

 

ICB

 

2

Construction Works of Mile Junction – Biyogurgur (Dubti-Arrisa-Addigala – Biyokebob Design and Build Road Project Contract 1: Dubti Town-Km 72+000) (Re-Tender)

72

 

AC

 

3.0 Years

 

DB

 

NCB

 

3

Construction Works of Negele Borena – Dolo ado – Melkasuftu: Lot 1; Negele Borena

– km 64+500 Road Project (Re -Tender)

64.5

AC

 

3.0 Years

 

DBB

 

ICB

 

 

 

Package XXV (25)

Item

No.

Project Name

 

Estimated

Length (Km)

Pavement Type

 

Project Duration

Contract Delivery

Procurement Type

 

1

Construction Works of Durbete – Kunzila – Gelago – Metema, Lot 2: Fingit – Gelago Design and Build Road Project

115.7

AC

3.5 Years

DB

ICB

 

2

Construction Works of Durbete – Kunzila – Gelago – Metema,

Lot 3: Gelago – Gendewuha Design and Build Road Project

125

 

AC

3.5 Years

 

DB

ICB

 

3

Construction Works of Endesilase – Rama-Gerehusenay Road Project,

Lot 1: Rama-Gerehusenay

91.66

AC

 

3.5 Years

DBB

 

ICB

 

4

Construction Works of Dessie Bypass Road Project

17

AC

 

2 Years

 

DBB

 

NCB

 

Note: – DB = Design and Build; DBB=Design, Bid and Build ICB = International Competitive Bidding: NCB = National Competitive Bidding; DBST=Double Surface Treatment and AC = Asphalt Concrete

2. The Ethiopian Roads Authority now invites bidders to submit sealed bids for providing the necessary labor, material and equipment for construction works of the above road projects.

3. Interested bidders shall submit the following evidence:

a. In the case of Ethiopian bidders, Certificate of Registration from Ministry of Construction with the relevant Categories as specified in item 4 of tables below renewed for 2012 EFY and other appropriate documentary evidences demonstrating the bidder’s compliance, which shall include:

i. Trading License renewed for 2012 EFY;

ii. Tax Clearance Certificate, which states that the bidder can participate in any public tender, valid at bid submission date;

ii. VAT Registration Certificate; and

iv. Registration as Supplier in the list of the mandated public body, i.e. public Procurement and Property Administration Agency (PPPAA).

b. In case of bidders other than Ethiopians;

i. Business organization registration certificate or Trade License issued by the country of establishment.

ii. Tax Clearance Certificate issued from the Tax Authority (Inland Revenue Authority) which allows the bidder to participate in public tenders at the date of the deadline for bid submission if the foreign bidder already has on-going or completed projects in the Country; Ethiopia.

4. Bidding will be conducted through International Competitive Bidding (ICB) and NCB (National Competitive Bidding) procedures as specified on the tables above and is open to all eligible bidders as specified and defined in the Bidding Documents. The minimum Annual Construction Turnover, Cash Flow, General and Specific Construction Experience for each of the project is as shown below:

4.1. Qualification and Evaluation Criteria of Package XXIV (24) Road Projects

4.1.1 Construction Works of Cheriti-Goro Beska – Gordamole, Lot III: Kundi -Gordamole Road Project (Re -Tender)

Item/ No

Qualification Criteria

 

Minimum Requirement

 

Local Bidders

Foreign Bidders

1

Annual Construction

Turnover for the Last Five Years

ETB 566 Million (Peak)

ETB 1.416 Billion (Average)

The annual construction Turnover (ACT) requirement for a Joint Venture (JV) of Local and Foreign Firms is ETB 1.062 Billion (Average).

2

Liquid Asset/Cash Flow

Requirement

ETB 177 Million

 

ETB 236 Million

 

3

General Construction

Experience

 

2 Years Firm Experience under Construction Contracts in the role of Prime Contractor, Joint Venture Partner, Management Contractor or Sub-Contractor.

5 Years Firm Experience under Construction Contracts in the role of Prime Contractor, Joint Venture Partner, Management Contractor or Sub-Contractor.

4

Specific Construction project Experience

A Minimum of One (1) Gravel Road Construction / Upgrading / Rehabilitation

Project with a Value of ETB 1.487 Billion ; OR

A Minimum of Two (2) Gravel Road Construction / Upgrading / Rehabilitation

Projects Each with a Value of  ETB 743 Million; OR

A Minimum of Three (3) Gravel Road Construction / Upgrading / Rehabilitation

Projects Each with a Value of ETB 496 Million;

In all cases, the experiences shall be within the last ten (10) years that has been successfully and substantially completed (70% Completed).

A Minimum of Two (2) Any Type of Asphalt (DBST/TST/AC) Road Construction or Upgrading or Rehabilitation at Projects Each with a Value of least ETB 2.124 Billion within the last ten (10) years that has been successfully and substantially completed (80% Completed).

 

 

 

 

5

Grade